Switch On Server; Figure 17: Ops Panel - Only The Power On Led Should Be Lit; Figure 18: Drawer Led Panels; Figure 19: Different Components Of The Server Control Panel Present At The Front - Seagate Lyve Rack R1 Installation Manual

Hide thumbs Also See for Lyve Rack R1:
Table of Contents

Advertisement

Figure 17: Ops panel - Only the Power ON LED should be lit.

8.2 | Switch ON server

After the 5U84 storage enclosure is switched ON and the LEDs show normal operation, switch on
server A and then server B.

Figure 19: Different components of the server control panel present at the front

Table 9: Server control panel component description

Item number
Name
1
Power button
2
Reset button
3
Power LED
4
HDD

Figure 18: Drawer LED panels

(two per drawer - left and right). Sideplane
OK/Power Good LED should be lit
Description
The main power switch applies or removes primary power
from the power supply to the server but maintains standby
power.
Reboots the system. Do not use unless requested by
support.
Indicates power is being supplied to the system power
supply units. This LED is illuminated when the system is
operating normally.
Indicates activity on the storage drive when flashing.
35
Lyve Rack R1 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents