To install the 5U84 storage enclosure:
1.
Identify 7U of rack space preferably as low in the rack as possible to keep the center of gravity
low to avoid toppling. Identify the correct orientation of the enclosure. The front of the 5U84 must
have sufficient space to open the drawer outside. You must identify the front and rear side of the
rack.
2.
Install the rail kits for 5U84 and both servers. Installing all rail kits first helps in confined spaces.
The server rail kits are in the server box and the 5U84 rail kits are in the 5U84 system pack box.
Ensure the front of the rail kit is installed in alignment of the front of the rack.
3.
With assistance, lift the 5U84 out from the box using the lifting straps.
4.
From the rear remove all the 5U84 rear modules to reduce the weight of the enclosure.
should be observed while handling these items to avoid static or mechanical damage. Do not touch
any exposed pins or circuit boards. Do not drop any rear modules.
5.
Slide the 5U84 onto the 5U84 rail kit and secure 5U84 to the rail kit to ensure it does not move
when the further items are installed into it.
6.
From the rear, insert the 5U84 rear modules. Insert all controllers, fan modules, and PSU
modules.
7.
From the front, only the drives that came on the same pallet should be installed in this 5U84 as
these drives are pre-configured for this Lyve Rack. The drives must be inserted into the drive slot
where they were factory preconfigured for both the top and bottom drawer according to
and
. Note the top drawer has drive 0 on the front left and each successive row has the
Figure 8
lowest number also on the left. Likewise, the bottom drawer has drive 42 on the front left and
each successive row has the lowest number also on the left. The term "front" and "left", is from
the perspective of the installer standing in front of an opened drawer.
→ A
CCESSING DRAWERS
→ CRU
5U
REPLACEMENT FOR
→ R
DDIC → I
EPLACING A
13
Lyve Rack R1 Installation Guide
CHASSIS
DDIC
NSTALLING A
are
C
Figure 7

Advertisement

Table of Contents
loading

Table of Contents