Figure 9: 6019P Server Cable Connections (Excluding Power Supply) - Seagate Lyve Rack R1 Installation Manual

Hide thumbs Also See for Lyve Rack R1:
Table of Contents

Advertisement

Lyve Rack R1 Installation Guide
a. Cable Server A Public Data Interface Cable to High Speed Switch using 9a.
b. Cable Server B Public Data Interface Cable to High Speed Switch using 9b.
c. If Y cable is used, cable the tail of the Y cable into High Speed Switch Port that has been
preconfigured as Breakout Port (bifurcated).

Figure 9: 6019P Server cable connections (excluding power supply)

19

Advertisement

Table of Contents
loading

Table of Contents