Pre-Installation

Receiving and Handling

Inspection

Upon delivery, thoroughly inspect all components for any
shipping damage that may have occurred, and confirm
that the shipment is complete. See
section for detailed instructions.
Note: Delivery cannot be refused. All units are shipped
F .O.B. factory. Trane is not responsible for shipping
damage.

Packaging/Shipping

As standard, air handlers ship as a complete unit or in
individual sections to be field assembled. All air handler
sections are stretch-wrapped or shrink-wrapped before
shipping. All factory shipping protection should be
removed upon delivery. This wrapping is for transit
protection only.
Smaller components and hardware may be shipped
separately, or shipped inside the unit. This hardware is
typically packaged in a clear plastic envelope or cardboard
box, and can be found inside the fan, mixing box, or access
section.
Trane FlexFit™ Units
There may be circumstances where the unit has to be
broken down smaller than an individual section. Trane can
do that with our FlexFit™ units.
Once a FlexFit unit is assembled at the factory, each panel
and subassembly is labeled and photographed. The unit is
then disassembled and components are packaged onto
pallets and shrink-wrapped for protection during
shipment. The process enables the unit to be shipped in
pieces to fit the exact size allowed for easy
maneuverability into the space while minimizing
assembly time on the jobsite.

Handling

Air handlers have an integral base frame designed with
the necessary number of lift points for safe installation.
See
"Lifting and Rigging, " p.
CLCH-SVX010A-EN

"Receiving Checklist"

12.
Receiving Checklist
Complete the following checklist immediately after
receiving shipment to detect possible shipping damage.
 Check to ensure that the shipment is complete. Small
components may ship inside the unit or ship
separately. Check the parts list to ensure all materials
are present. If any component is missing, contact your
local Trane sales office.
 Check all units, components, connections, and piping.
Check fan wheel for free rotation by spinning
manually. Check all doors, latches and hinges. Inspect
interior of each unit or section. Inspect coils for
damage to fin surface and coil connections. Check for
rattles, bent corners, or other visible indications of
shipping damage. Tighten loose connections.
 If a unit is damaged, make specific notations
concerning the damage on the freight bill of lading. Do
not refuse delivery.
 Notify the carrier's terminal of the damage
immediately by phone and mail. Request an
immediate joint inspection of the damage by the
carrier and consignee.
 Notify your Trane sales representative of the damage
and arrange for repair. Do not attempt to repair the unit
without consulting the Trane representative.
 Inspect the unit for concealed damage as soon as
possible after delivery. Report concealed damage to
the freight line. It is the receiver's responsibility to
provide reasonable evidence that concealed damage
did not occur after delivery. Take photos of damaged
material if possible.
Note: Concealed damage must be reported within 15
days of receipt.

Jobsite Storage

Air handlers and field-installed accessories must be
protected from the elements. A controlled indoor
environment is recommended for proper storage.
Note: All factory shipping protection should be removed,
This wrapping is for transit protection only.
The unit controller and all other electrical/electronic
components should be stored in conditions of -20°F to
120°F and 5 to 95 percent relative humidity, non-
condensing. Electrical components are not moisture-
tolerant.