Indoor Roof - Trane Climate Changer TCFS Nstallation, Operation, And Maintenance

Table of Contents

Advertisement

Installation - Mechanical

Indoor Roof

Note: Corner gussets are to ensure unit squareness
during shipping, lifting, and assembly. Please
remove, when unit is set in place.
1. Ensure shipping split sections are aligned and pulled
together properly.
2. Apply a bead of caulk to full height of wall joint.
3. Apply 3-inch x 1/8-inch adhesive-backed foam gasket
to inner joining strip.
4. Install inner joining strip using #14 x 1.5-inch gasketed
TEK® screws.
Figure 24. Indoor wall and roof assembly - trim cap
Gasket
#10 SMS
18 ga. strip
18 ga. trim cap
No greater than 6 inch spacing
on all fasteners
24
18 ga. strip
Interior of unit
"Zip" screw
18 ga. strip
18 ga. trim cap
5. Fit the pre-cut hub cap over the joining strip the vertical
height of the wall flush with the roof and secure it to the
wall with #8 sheet metal screws.
6. Fill the top and bottom openings with caulk as a
moisture seal. Screw holes can be pre-drilled with a
#29 bit.
7. Apply a bead of caulk over top corner of cap seam.
8. Using #10 sheet metal screws, attach corner seam trip
cap as shown in
Figure
18 ga. trim cap
24.
Roof wall trim
CLCH-SVX010A-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Climate changer tcpa

Table of Contents