Stacked Unit

1. Install and assemble all lower sections as described in
typical assembly.
2. Lift first piece of upper section into place assuring
proper alignment with lower unit.
3. Install 10 gauge 12-inch angle clips as shown in
Figure 27
and secure with grade 5 self-tapping screws
placed 4-inches on center.
Figure 27. Stacked unit trim assembly
10 1/2
7 1/2
4 1/2
1 1/2
0
CLCH-SVX010A-EN
Roof-to-wall
trim cover
Cap
18 ga. steel
.050 if aluminum
12-in. clip every 8 ft.
and at all corners use
grade 5 self-tapping
screws 4-in. ctc
10 ga. steel
.125 if aluminum
Roof trim cap
14 ga. minimum
.125 if aluminum
4. Lift next upper piece into place and secure shipping
split with appropriate hardware then anchor to lower
section as described above.
5. Continue until all sections are installed and anchored
properly.
6. Install the 18-gauge cover trim cap using #10 self
drilling screws.
Upper unit
Lower unit
Installation - Mechanical
27