Rinnai RS100 Training Program page 10

Condensing boiler controller
Table of Contents

Advertisement

RS100 Power-on Initialization
RS100 – Display during initialization
The following sequence will occur every time power is reset or the "reset" button on the boiler is pressed
This process takes about 30 seconds
A display test
The selected language will
The current
Auto set will display for
will occur where
display.
software version
a few seconds. NOTE:
"GB" = English
all characters
will display
If the A and B wires are
If factory defaults are restored to
are illuminated
(Version 2.3 is
reversed from the
the controller, this should be
current as of
controller to the boiler,
changed to ―GB‖
10/09)
the controller will not
Pressing the dial will exit the
exit this page
language display quicker
www.rinnai.us • © 2009 Rinnai America Corporation
10

Advertisement

Table of Contents
loading

Table of Contents