ELECTRICAL

Fusible Link Harness

The machine uses 3 fusible links (Figure 18 and 19) for the circuit protection. These fusible links are located in
a harness that connects the starter B+ terminal to the main wire harness. If any of these links fail, current to the
protected circuit stops.
Ensure that the key switch is in the OFF position, disconnect the negative battery cable from the battery terminal,
and then disconnect the positive cable from the battery. Locate and unplug the fusible link connector from the
machine wire harness. Use a multimeter to ensure that the continuity exists between each terminal pin in the
connector P1 and connector J1 at the starter. If any of the fusible links are open, replace the fusible link harness.
NOTE: Ensure any conditions that may have damaged the fusible links have been identified and repaired.
After completing the testing, ensure that the fusible link harness connectors are correctly attached to the starter
and machine wire harness. Connect the positive battery cable to the battery terminal and then connect the
negative cable to the battery.
Figure 18
Figure 19
8-16
Z Master 7500-D Series Service Manual
Table of Contents
March 2018 - Digital Edition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7406074064740727407474096

Table of Contents