Copyright © 2015, Juniper Networks, Inc.
Install Cage Nuts, if Needed
Install cage nuts, if needed, in the mounting holes specified in
On the front of the rack rails, install cage nuts for the chassis.
1.
On the back of the rack rails, install cage nuts for the large shelf.
2.
Install the Large Mounting Shelf and Spacer Bars
On the back of each rack rail, partially insert a mounting screw in the highest hole
1.
specified for the large shelf in
Install the large shelf on the rack. Hang the shelf over the mounting screws using the
2.
keyhole slots located near the top of the large shelf flanges.
Partially insert a mounting screw into the open holes in each large shelf flange.
3.
Tighten all the screws completely.
4.
Remove the Spacer Bars and Center-Mounting Brackets
The router is shipped with a spacer bar attached to the back of each front-mounting
flange, and two center-mounting brackets attached to the chassis.
If you plan to front-mount the router in an open-frame rack:
Remove the spacer bars by loosening the screws that fasten the spacer bars to the
1.
front-mounting flange.
Remove the center-mounting brackets from the chassis by loosening the screws
2.
at the top and bottom of each bracket.
If you plan to center-mount the router in an open-frame rack, leave the center-mounting
brackets attached to the chassis. Optionally, you can remove the spacer bars.
Table 2 on page
10.
Install Cage Nuts, if Needed
Table 2 on page
10:
11