Confirming The Switch Link Information; Releasing The Switch Data Link; Releasing The Data Link On A System 75 G1 Or G3 Switch - Avaya INTUITY AUDIX Migration Manual

Messaging solutions
Hide thumbs Also See for INTUITY AUDIX:
Table of Contents

Advertisement

Confirming the Switch Link Information

Releasing the Switch Data Link

Releasing the Data Link on a System 75 G1 or G3 Switch

June 2002
The switch link information is not transferred during the migration. The
switch parameters require readministration either by you or the Remote
Support Center.
To check the switch link parameters:
1. Start at the INTUITY main menu and select:
Switch Interface Administration
DCIU Interface Administration
The system displays the DCIU Interface Administration window,
as in DCIU Interface Administration Window (page 74).
2. Compare the contents of this screen to the information on the
Switch Link DCIU-SCI Screen (page 75) for the DEFINITY
AUDIX.
3. Change any fields that do not match the DEFINITY AUDIX
screen.
For this procedure, DEFINITY switches are divided as follows:
n
Releasing the Data Link on a System 75 G1 or G3 Switch
(page 33)
n
Releasing the Data Link on a G2 Switch (page 34)
To release the data link, perform the following tasks on the switch
administration terminal (SAT):
1. Enter release link n
where n is the number of the link going to the INTUITY AUDIX
system. Valid input is an integer from 1 to 8.
For more information, see the DEFINITY switch documentation.
2. Continue with Completing Additional Installation Tasks
(page 34).
585-313-118 Issue 4
Migrating from DEFINITY AUDIX
33

Advertisement

Table of Contents
loading

Table of Contents