Link Stay - Husqvarna P524 Workshop Manual

Hide thumbs Also See for P524:
Table of Contents

Advertisement

Chassis

5.1.5 Link stay

Tools
Torx
Combination wrench
Combination wrench
Combination wrench
Dismantling
1.
Apply park brake.
2.
Remove the cover over the rear transmission.
3.
Remove the 2 screws from the pulley guard.
4.
Place a jack assembly under the machine as
illustrated and stabilize the machine, so that it
does not fall when the link stay is dismantled.
5.
Note how the link stay grease nipples are turned
for refitting.
6.
Turn the steering wheel to full right lock to
prepare the space for dismantling the link stay.
7.
Loosen the control stay at the front and secure it
with a cable tie to the transmission shaft.
8.
Relieve pressure on the rear carriage with
another jack assembly in order to take pressure
off the link stay.
22 – English
Dimension
9.
T30
13 mm
15 mm
17 mm
10. Loosen the rear link stay fastening.
11. Dismantle the locking nut, washer, screw and
12. Dismantle the driver's seat. For more
13. Dismantle the protector plate located under the
Dismantle the cover protecting the belt and the
link stay under the engine.
sleeve.
7
1.
Link stay
2.
Sleeve
3.
Screw
information, refer to section "5.1.2 Driver's seat"
on page 18.
seat.
3
2
1
5
6
4
4.
Locknut
5.
Washer
6.
Steering block

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents