Backing Up The Project; Transmission From The Execution Memory Ram To The Backup Memory Rom2 - Panasonic FP7 Series User Manual

Cpu unit
Hide thumbs Also See for FP7 Series:
Table of Contents

Advertisement

5.3 Backing Up the Project

5.3.1 Transmission from the Execution Memory RAM to the Backup Memory
ROM2
In normal operation, you can save your project in the execution memory RAM/ROM1, and use
the saved data. In order to prepare for unplanned rewriting, backup memory ROM2 is also
installed.
When the mode switch is set to PROG., you can back up the execution project that is saved in
RAM into ROM2.
 Switch setting conditions
Switch
Mode switch
Card operation switch
 Procedure
1. Set the mode switch to PROG.
2. By executing "Online" → "Project Backup" using FPWIN GR7, the project is
transmitted from the execution memory RAM to the backup memory ROM2.
Setting
PROG.
ROM
5.3 Backing Up the Project
5-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afp7cps21Afp7cps31Afp7cps31eAfp7cps41e

Table of Contents