Legend To Sequence Diagrams; Legend To The Sequence Diagrams - Siemens LMV36.520A1 Basic Documentation

Basic unit with integrated fuel-air ratio control for forced draft burners
Table of Contents

Advertisement

94/248
Building Technologies Division
Infrastructure & Citiies Sector

7.7.6 Legend to sequence diagrams

7.7.7 Legend to the sequence diagrams

Note
Not all phases, times, indices, abbreviations and symbols appear in the
individual sequence diagrams or are needed there!
Phase numbers
00
Lockout phase
02
Safety phase
10
Home run
12
Standby (stationary)
22
Fan motor (M) = ON, safety valve (SV) = ON
Air damper (LK)  fuel valve (V) – position
24
30
Prepurging
Air damper (LK)  ignition (Z) – position
36
38
Preignition ignition (Z) = ON
39
Test pressure switch-min (Pmin)
40
Fuel valve (V) = ON
42
Ignition (Z) = OFF
44
Interval 1 (t44)
50
Safety time 2 (TSA2)
52
Interval 2 (t52)
60
Operation 1 (stationary)
Operation 2 air damper (LK)  low-fire (KL) – position
62
70
Afterburn time (t13)
Air damper (LK)  Rated load (NL) – position
72
74
Postpurge time (t8)
78
Postpurge time (t3)
80
Evacuation of test space
81
Atmospheric pressure test
82
Filling of test space
83
Gas pressure test
90
Gas shortage waiting time
Valve proving is performed depending on the parameter settings:
Simultaneously with the prepurge time and/or the afterburn time.
Times
TSA1
1st safety time
TSA2
2nd safety time
t1
Prepurge time
t3
Postpurge time
t8
Postpurge time
t13
Afterburn time
t44
Interval 1
t52
Interval 2
Basic documentation LMV36...
7 Basic unit
CC1P7544en
25.09.2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agm60.4a9

Table of Contents