Cable Preparation; Wiring Sequence - Siemens SINAMICS G120P Hardware Installation Manual

Power module pm230 ip55/ul type 12
Hide thumbs Also See for SINAMICS G120P:
Table of Contents

Advertisement

4.5

Cable preparation

Preparation information
The table and the diagram below are provided to ensure that the cables for use with the PM
power and motor terminals are prepared correctly.
No screening dimensions are given for the input power cables as these are not normally
screened cables.
Diagram
Cable type
FSA power cable
FSA motor cable
FSB power cable
FSB motor cable
FSC power cable
FSC motor cable
4.6

Wiring Sequence

Overview
Due to the nature of the Power Module enclosure, the following guidelines are given to
provide a more effective and efficient sequence to ensure that the wiring of the Power
Module is completed correctly.
Prerequisite actions
Ensure the Power Module has no power connect prior to installing cables and wiring
It is essential that during the installation phase of the cables and wiring of the Power
Module that no power, in any form, is connected to the Power Module or the attached
Control Unit.
If power has been applied to the Power Module or the Control Unit this MUST be
disconnected. Once the power has been removed, the user should wait for at least 5
minutes before proceeding with the electrical installation of the Power Module.
Power Module PM230 IP55
Hardware Installation Manual, 2010-07-02, A5E02923635A AB
Dimensions
A
10 mm
0.39 inches
10 mm
0.39 inches
10 mm
0.39 inches
10 mm
0.39 inches
10 mm
0.39 inches
10 mm
0.39 inches
DANGER
B
C
60 mm
-
2.36 inches
60 mm
10 mm
2.36 inches
0.39 inches
60 mm
-
2.36 inches
50 mm
10 mm
1.96 inches
0.39 inches
50 mm
-
1.96 inches
50 mm
10 mm
1.96 inches
0.39 inches
Connecting
4.5 Cable preparation
D
90 mm
3.54 inches
60 mm
2.36 inches
50 mm
1.96 inches
40 mm
1.57 inches
70 mm
2.75 inches
40 mm
1.57 inches
45

Advertisement

Table of Contents
loading

Table of Contents