Installation Requirements; Precautions; Attaching The Mounting Brackets To The Switch; Mounting The Switch On A Rack - ZyXEL Communications GS1920v2 Series User Manual

8/24/48-port gbe smart managed switch
Hide thumbs Also See for GS1920v2 Series:
Table of Contents

Advertisement

Note: Make sure there is enough clearance between each equipment on the rack for air
circulation.
2.5.1 Insta lla tio n Re q uire m e nts
• Two mounting brackets.
• Eight M3 flat head screws and a #2 Philips screwdriver.
• Four M5 flat head screws and a #2 Philips screwdriver.
2.5.2 Pre c a utio ns
• Make sure the rack will safely support the combined weight of all the equipment it contains.
• Make sure the position of the Switch does not make the rack unstable or top-heavy. Take all
necessary precautions to anchor the rack securely before installing the unit.
2.5.3 Atta c hing the Mo unting Bra c ke ts to the Switc h
Position a mounting bracket on one side of the Switch, lining up the four screw holes on the bracket with
1
the screw holes on the side of the Switch.
Attaching the Mounting Brackets
Fig ure 8
Using a #2 Philips screwdriver, install the M3 flat head screws through the mounting bracket holes into
2
the Switch.
Repeat steps
3
You may now mount the Switch on a rack. Proceed to the next section.
4
2.5.4 Mo unting the Switc h o n a Ra c k
Position a mounting bracket (that is already attached to the Switch) on one side of the rack, lining up
1
the two screw holes on the bracket with the screw holes on the side of the rack.
Chapter 2 Hardware Installation and Connection
1
and
2
to install the second mounting bracket on the other side of the Switch.
GS1920v2 Series User's Guide
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents