Assembly - Grizzly G0767 Owner's Manual

Abrasive tube notcher
Table of Contents

Advertisement

Assembly

To assemble machine:
1.
Place shipping crate near operational loca-
tion, then remove crate from shipping pallet
and set small items aside.
2.
Unbolt base from shipping pallet.
3.
Move base to selected location and properly
anchor it to floor (refer to Anchoring to Floor
on previous page).
4.
Remove the four cap screws that secure
electrical box inside column (see Figure 7).
Cap Screws
Electrical Box
Figure 7. Location of cap screws that secure
electrical box.
5.
Slide electrical box out of column and place
on top of motor.
6.
Remove column front cover by removing the
four cap screws that secure it (see Figure 8).
Cap Screws
(2 of 4)
Figure 8. Location of column front cover and
securing cap screws.
-16-
7.
Remove the six pre-installed cap screws from
top of base (see Figure 9).
Figure 9. Cap screws on top of base.
8.
Have another person hold machine steady so
that it does not tip, then remove hex nuts that
secure machine column to pallet.
9.
Listed below are two methods for lifting
machine onto base. Use method that is best
for your operation.
— Wrap web slings around machine and
attach them to a lifting device (see Figure
10 for an example).
Figure 10. Example photo of web slings
positioned on machine and lifting device.
Front
Cover
Model G0767 (Mfd. Since 1/14)

Advertisement

Table of Contents
loading

Table of Contents