Chapter 6: Initial steps using the ACLI
The initial commissioning steps involve basic setting configuration.
Prerequisites to initial steps
• You must install the hardware.
• You must install at least one cable to set up a remote connection to the switch.
• You must turn on the switch.
Initial commissioning procedures
The following task flow shows the sequence of procedures you perform for the initial
commissioning steps. To link to a procedure, click on the procedure title in
navigation
Commissioning
on page 50.
Initial commissioning