The initial commissioning steps involve basic configuration settings.
Prerequisites to initial steps
• You must install the hardware.
• You must install at least one cable to set up a remote connection to the switch.
• You must turn on the switch.

Initial commissioning procedures

The following task flow shows the sequence of procedures you perform for the initial
commissioning steps. To link to a procedure, click the procedure title in