Chapter 5: Cooling Module Installation And Removal For The Vsp 9012; Installing The I/O Cooling Module For The Vsp 9012 - Avaya 9012FC IO Manual

Installing cooling modules for virtual services platform 9000
Table of Contents

Advertisement

Chapter 5: Cooling module installation and
This section describes how to install and remove the cooling modules for the Virtual Services
Platform 9012.
Install a cooling module to provide cooling to the interface, Switch Fabric (SF), and Control
Processor (CP) modules. Installation takes 2 to 5 minutes.

Installing the I/O cooling module for the VSP 9012

Install the I/O cooling module in the front of the chassis to provide cooling to the interface and CP
modules. You must install two I/O cooling modules in the chassis. You can hot swap the cooling
modules.
Before you begin
Determine which of the following two types of I/O cooling modules you require for the Virtual
Services Platform 9012:
• 9012FC cooling module: Use with first generation modules.
• 9012FCHS cooling module: Required for second generation modules and can use with first
generation modules.
Note:
The Virtual Services Platform 9000 supports the 9048XS-2 module in first generation mode
and second generation mode. The Virtual Services Platform 9012 requires the 9012FCHS
I/O cooling module to be installed before you install the 9048XS-2 module.
Procedure
1. Locate the bay where you want to install the cooling module.
2. Slide the cooling module into the chassis.
Installing Cooling Modules in Avaya VSP 9000
52
removal for the VSP 9012
Comments? infodev@avaya.com
March 2015

Advertisement

Table of Contents
loading

This manual is also suitable for:

9012fc9010cm9012fchs9012rc

Table of Contents