4-12 TAKE-UP UNIT OPERATION CHECK (Referential Time : 2min.)
This is required when Take-up unit is installed or TU Junction Board is replaced.
This is to check whether Take-up Unit operates properly.
Confirm that the cable is connected to the connector
1
named [TAKE UP] and turn on the Main Power SW.
Turn on the Sub Power SW while pressing [
2
and [
] keys to enter the Service Mode.
Select [SUB MENU] > [TU CHECK] > [TU] menu.
3
[TU] menu supports the connector named
[TAKE UP].
Although [OPTION-TU] menu is for another
connector with no name, it is not in use.
Undersurface of the right side of machine
], [
]
MENU
SERVICE MENU
4-56
+
MENU
SERVICE MENU
SUB MENU
[ ]
[ ]
SUB MENU
TU CHECK
[ ]
TU CHECK
TU
[ ]
TU
START
START
[ ]