Operation
Performing Fixture Compensation
Performing Fixture Compensation
To enhance measurement accuracy, fixture compensation should be done before
DUT measurement. The fixture compensation requires measurements with the
16047E for open and short compensation data. The following procedure shows the
measurement for the compensation data.
Performing Open Compensation
The open compensation procedure is as follows.
1. Fasten the electrode securing screws at the HIGH and LOW sides with no DUT
Do not fasten the screws too tightly to prevent the electrodes from damaged.
NOTE
2. Follow the instruction manual that came with your instrument to perform a
Performing Short Compensation
The short compensation procedure is as follows.
1. Remove the shorting bar secured on the guard terminal.
2. Loosen the electrode securing screws so that the shorting bar is caught in the
NOTE
Place the shorting bar in the proper direction so that it does not contact to the guard
terminal.
20
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
leads caught in the electrodes.
measurement to obtain open compensation data.
electrodes.
Chapter 3