SECTION 1 SERVICE INFORMATION
8) Page 13 ~ 14
- LD1 INFO
- LD2 INFO
* Intentional Off
• If one of the laser device has an open failure for blue or yellow light, the projector cuts off the other laser
device intentionally to maintain the proper white balance. It will return the normal operation when the LD bank
which has an open failure device actually is replaced with new one.
9) Page 15 ~ 18
- LD1-B/LD1-S/LD2-B/LD2-S ON /OFF history log
Information of each bank of LD1 (On count / Runtime / Status*)
Information of each bank of LD1 (On count / Runtime / Status*)
* Status (0 : Off/ 1: On /* : Intentional Off)
INF-24
<RZ31K/RS30K>