Installing The 1U And 2U Flush-Mount Rack Kit For Two-Post Racks (Xbr-000307 And Xbr-R000293); Time And Items Required - Extreme Networks ExtremeSwitching VDX 6740 Hardware Installation Manual

Table of Contents

Advertisement

Installing the 1U and 2U Flush-Mount Rack Kit for Two-Post Racks (XBR-000307 and XBR-R000293)

3.
Tighten all the screws to a torque of 9 in-lbs (10 cm-kgs).
FIGURE 35 Attaching the rear brackets to the device
1.
Screw, 8-32 x 5/16-in., panhead Phillips
Installing the 1U and 2U Flush-Mount Rack Kit for
Two-Post Racks (XBR-000307 and XBR-R000293)
Use the following instructions to install a fixed-port device in a flush-mount configuration using the 1U and 2U Flush-Mount Rack Kit for
Two-Post Racks (XBR-000307 and XBR-R000293).
Observe the following when mounting this device:
Two people are required to install the device in a rack. One person holds the device, while the other secures the device in the
rack.
Before mounting your device, review any specific installation and facility requirements in this Hardware Installation Guide.
Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing into the
rack.

Time and items required

Allow 15 to 30 minutes to complete this procedure.
The following items are required to install a device using the 1U and 2U Flush-Mount Rack Kit for Two-Post Racks (XBR-000307 and
XBR-R000293).
Phillips #2 torque screwdriver
1/4-inch slotted blade torque screwdriver
56
ExtremeSwitching VDX 6740 Hardware Installation Guide
9036108-00

Advertisement