Time And Items Required; Parts List - Extreme Networks ExtremeSwitching VDX 6740 Hardware Installation Manual

Table of Contents

Advertisement

Installing the Universal Four-Post Rack Kit (XBR-R000296)
in.) smaller than 40.64 cm (16 in.), so it will install into a rack with a maximum depth of 81.28 cm (32 in.) - 5.08 cm (2 in.) = 76.2 cm
(30 in.).
Observe the following when mounting this device:
Two people are required to install the device in a rack. One person holds the device, while the other screws in the front and rear
brackets.
Before mounting your device, review any specific installation and facility requirements in this Hardware Installation Guide.
Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing into the
rack.

Time and items required

Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Four-Post Rack Kit:
#2 Phillips torque screwdriver
1/4-inch slotted-blade torque screwdriver

Parts list

The following parts are provided wit the 1U, 1.5U, and 2U Universal Kit for Four Post Racks Installation (XBR-R000296).
62
ExtremeSwitching VDX 6740 Hardware Installation Guide
9036108-00

Advertisement

Table of Contents
loading

Table of Contents