Motorola MVME2100 Installation And Use Manual page 126

Hide thumbs Also See for MVME2100:
Table of Contents

Advertisement

use
2-7
PMC2 LED (DS3)
PMCs
installing
preparing
PMCspan
described 1-2,
installing the -001 version on an
MVME2100
installing the -010 version on PMCs-
pan-001/MVME2100
preparing
port, Ethernet
power needs
1-19
power requirements
powering up system
PPC5-Bug>
4-11
prompt
4-2
PPC5-Diag> 4-2,
PPCBug
basics
4-1
commands
overview
prompt
4-2
PPCBug commands
uses of
4-2
PPCBug debugger firmware
preparing
PMCs
1-6
PMCspan
system console terminal
the MVME2100
primary PMCspan
installing
Primary SCSI Bus Negotiations
I
Primary SCSI Data Bus Width
N
prompt
D
PPCBug
prompt, debugger
E
X
R
required equipment
IN-4
2-4
1-8
1-6
1-6
1-13
1-15
1-6
2-4
B-1
2-1
4-11
4-5
4-1
5-1
1-6
1-6
1-4
1-11
5-5
5-6
4-2
4-11
1-1
resetting the system
2-4
restart mode
4-12
RF emissions
B-3
ROMboot enable 5-8,
5-11
RUN LED (DS3)
2-4
S
SCSI bus
reset on debugger startup
SD command
4-11
secondary PMCspan
installing
1-14
Secondary SCSI identifier
set environment to bug/operating system
(ENV)
5-3
setup terminal
1-18
shielded cables (see also cables)
specifications
MVME2100
B-1
status indicators
2-4
MVME210x front panel
stop bit per character 1-6,
switches
2-3
MVME2100 front panel
SYS (DS2)
LED
2-4
SYSFAIL*configuring
PPCBug parameter (Negate VMEbus
SYSFAIL* Always)
system console terminal
system console, connecting
system control jumper (J2)
system controller
1-17
selection header
1-5
system controller function
T
temperature measurement B-4,
temperatures, component
terminal setup
1-18
testing the hardware
4-11
thermal performance, validation, thermal
Computer Group Literature Center Web Site
Index
5-5
5-6
B-3
2-4
2-5
2-3
5-5
1-3
1-18
1-4
2-5
B-8
B-4
B-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents