installation

Optional Framing Kit

OPTIONAL FRAMING KIT
An optional framing kit is available to facilitate easier installation of the noncombustible board.
The optional framing kit is to be installed within the existing wood framing. The framed opening is 46-1/2" wide x 45-1/4" high or 46-3/8" high if using the
base standoffs and 21-1/2" deep. See instruction manual for complete details.
1. Fold out side nailing strips from the side of the unit to 90º as shown
below.
Determine the overall combined thickness of the non-combustible board
+ finished material being used. The nailing strips can be adjusted up to
3-3/8".
Fold out nailing strips to 90º
2. Adjust the nailing strips by loosening 2 screws on each nailing strip -
adjust and retighten screws.
Attach tall vertical studs
(792-022) from framing kit to
existing wood framing.
919-508
|
20
Regency Excalibur
792-021
1 QTY
792-022
2 QTY
792-023
1 QTY
792-033
2 QTY
Adjust nailing strips
P90E-11 Direct Vent Gas Stove
®
3. Attach both vertical studs and secure using pointed wood screws to pen-
etrate steel studs to secure. There are 6 screws which are not provided.
(2 at bottom, 2 at top and 2 on sides). (Corner framing shown in diagram).
NOTE: Ensure the flat side of the steel stud is facing the wood framing.
4. Slide the unit into position. Hook up gas, venting and electrical prior to
installing the remaining steel studs.
5. Secure the top horizontal steel stud (792-023) as shown with 2 screws
per side.
6. Secure the wide horizontal stud (792-021) with 2 screws per side..
7. Secure 2 thin vertical studs (792-033) on either side of the appliance with
4 screws each. Above screws are provided.
Horizontal stud
(792-023)- see Step 5
Wide Horizontal
stud (792-021)- see
Step 6
Thin Vertical studs -
(792-033) see Step 7
Framing kit dimensions
1
P90
02.12.15