Optional Framing Kit - Regency U1500E-NG11 Manual

Table of Contents

Advertisement

U1500E-11 Gas Fireplace

Optional Framing Kit

1. Construct the timber framing, ensure inside dimensions are 48-5/8" H x
55" W as shown below.
48-5/8""
2. Bend both side nailing strips from the side of the appliance until
positioned as shown below.
Determine the overall combined thickness of the non-combustible board
+ finished material being used. The nailing strips can be adjusted up to
1-1/2" .
Remove top nailing strip (by removing 3 screws) and recycle.
3. Adjust the nailing strips by loosening 2 screws on each nailing strip -
adjust and retighten screws.
4. Attach both vertical studs (676-036)A to the vertical timber studs and
secure using 6 screws (2 at bottom, 2 at top and 2 on sides) as shown.
NOTE: Ensure the flat side of the steel stud is facing the wood framing.
8 | U1500E-11 Gas Fireplace
919-807
OPTIONAL FRAMING KIT
55"
Remove Top
Nailing Strip
Nailing Strips
7 03 A
A
A
5. Secure horizontal steel header stud (606-067) with 2 screws per side as
per diagram.
6. Slide the unit into position. Hook up gas, venting, electrical and
conversion kit (if purchased) prior to installing the remaining steel studs.
7. Secure the upper horizontal steel studs as shown with 2 screws per
side.
8. Secure the 2 remaining large horizontal studs (606-066)A with 2 screws
per side as shown.
Horizontal
stud
(606-067)A
Large stud
(606-066)A
Large stud
(606-066)A
1
U1500E
(676-036)A
Flat side out
Header stud
(606-067)A
08.21.17

Advertisement

Table of Contents
loading

This manual is also suitable for:

U1500e-lp11

Table of Contents