Commissioning - Mira Vision Installation Manual

Hide thumbs Also See for Vision:
Table of Contents

Advertisement

COMMISSIONING

Connect battery to Wireless Controller, display appears.
Turn on electrical supply to Digital Mixer Valve.
Make sure the end of the hose is
in either the bath, shower tray or
other water catchment area.
Press " " button and reduce
temperature to full cold "CLd".
Press "
" to increase to full
flow. For Low Pressure (pumped)
version, let shower run in order
to prime the pump. For long
pipe runs, allow 3 - 4 minutes for
priming.
Caution! Risk of product damage.
Do not run Pumped Valve (low
pressure version) without a water
supply for longer than 15 minutes
during priming.
30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents