13. Important! A 12 litre/minute flow regulator is
fitted inside the outlet This can be removed
for gravity fed / other low pressure systems
(0.5 bar or below).
14. Temporarily install the hose and showerhead
and commission the mixing valve.
Note! The mixing valve must be Commissioned
before the final installation of the shower
fittings.
Securing Screw
(Access required
for temperature
setting)
Note! Ensure the sealing washers are installed
into the hose.

COMMISSIONING

Maximum Temperature Setting

Before using the shower the maximum
temperature must be checked to make sure
that it is at a safe level. It has been preset
to approximately 43°C at the factory but due
to variations in site conditions the maximum
temperature may need adjustment.
Note! Make sure that the hot water temperature
is at least 55°C and that there is sufficient supply.
1. Turn on the mixer to the maximum temperature
(i.e. fully clockwise)and full flow, and allow the
temperature to stabilise.
2. Test that the temperature of the water from
the shower outlet is hot enough.
If the temperature is too hot or too cold adjust
as follows:
3. Loosen the securing screw (do not remove
fully) and lift up the temperature lever to
disengage from the control gear.
4. Rotate the temperature lever anti-clockwise
(one serration), re-engage with the control
gear and return to the maximum temperature
stop. Check the temperature, if it is still not
hot enough repeat the procedure.
5. O n c e t h e m a x i m u m t e m p e r a t u r e i s
satisfactory, tighten the securing screw.
Securing Screw
6. After commissioning of the mixing valve is
complete, remove the showerhead.
10
Temperature Control
Lever
Pull down and rotate
the temperature lever
to adjust the maximum
temperature