Commissioning; Priming The Appliance - Mira event Installation, Operation, Maintenance Manual

Manual all-in-one power shower
Table of Contents

Advertisement

Section
7

1. Priming the Appliance

The appliance must not be run dry.
Before proceeding any further with
the installation it is important to
prime the pump assembly before
switching on the electrical supply.
1.1
Connect the flexible hose
from the shower fitting to
the outlet of the appliance.
Ensure hose washer is
fitted.
Do not over-tighten.
1.2.
Turn on water supplies.
1.3.
Turn the flow control fully
on.
1.4.
Turn the temperature knob
anti-clockwise to check the
hot supply and clockwise to
check the cold supply.
1.5.
The pump is now primed.
1.6.
Switch on the electrical
supply to the product.

Commissioning

22
Hose washer
Flexible hose
Colder
Hotter

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents