Chapter 3
Installing and Cabling the C-series
Platform
Before You Begin
Freestanding Installation
This chapter describes how to install the C-series platform and attach cables. It
contains the following topics:
Before You Begin
on page 13
Freestanding Installation
Rack-Mounted Installation
on page 15
Cabling the System
on page 18
The Next Step
Before installing the system, be sure you:
Have a plan for installing the system that takes into consideration future
expansion.
Have the tools and accessories needed to complete the installation.
Read and understand the clearance requirements for the front and back of the
chassis for cable routing and other unit access. See Environmental
Requirements
on page 44 for more information.
Read and understand the clearance requirements for the top and bottom of the
chassis to ensure adequate ventilation.
Prepare the equipment racks by measuring and marking space for each system
you plan to install.
When installing the system on a table top or in any other freestanding mode, be sure
to leave enough space around the system for adequate ventilation. Position the
on page 13
on page 14
13
Before You Begin