Packing List; Additional Items Required; Recommended Installation Procedure - FireplaceXtrordinair ProBuilder 72 Linear MV Installation Manual

Table of Contents

Advertisement

Packing List

LP (Propane) Conversion Kit - Burner Orifices (2)-(#54), Pilot Orifice (0.14 LP), LP Regulator
Thimble (2-Piece Assembly)
Pipe Shield, Header Shield (shipped attached to top of fireplace)
Wall Switch, Cover Plate, and Wire

Additional Items Required

Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)
This Fireplace Requires 8 lbs. (3.6 Kg) of 1/4" Crushed Glass
94500580 Platinum (10 lbs./4.55Kg)
94500581 Bronze (10 lbs./4.55Kg)
94500582 Cobalt (10 lbs./4.55Kg)
94500583 Black (10 lbs./4.55Kg)

Recommended Installation Procedure

Frame the opening for the fireplace. Make sure to allow for vent installation.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 41).
© Travis Industries
Installation
(for qualified installers only)
1/2/19 - 1458
7
PB 72 MV/GSB2 Install

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Probuilder 72 linear gsb2

Table of Contents