FireplaceXtrordinair ProBuilder 72 Linear MV Installation Manual page 16

Table of Contents

Advertisement

16
3
Line up the holes on the pipe shield tabs with the holes on the top of the fireplace. Use the screws that
secured the shield during shipping to attach the pipe shield to the top of the fireplace.
© Travis Industries
Installation
(for qualified installers only)
1/2/19 - 1453
PB 72 MV/GSB2 Install

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Probuilder 72 linear gsb2

Table of Contents