Unship The 5000 Series Ups - Toshiba 5000 SERIES Installation And Operation Manual

Nema-3r 3-phase ups. industrial duty 3-phase ups
Hide thumbs Also See for 5000 SERIES:
Table of Contents

Advertisement

4.3

Unship the 5000 Series UPS

The 5000 Series Industrial Duty UPS has a C-channel skids base with fork pockets for font/back forklift ac-
cess, and four lifting eyes for hoisting. The skids are bolted to the shipping pallet to secure the UPS during
shipping. Follow the directions below to unship the UPS.
TOP HEAVY EQUIPMENT. THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED
IN PLACE.
Lift and move carefully, and only with adequate equipment and trained personnel. IM-
PROPER LIFTING CAN RESULT IN INJURY OR DEATH.
Carefully inspect the UPS for shipping damage. Units shipped within North America and NAFTA are shrink
wrapped.
1
5. Use a forklift to transport the UPS to it's installation
location. See Section 8.3.
FIGURE 4.2: UNSHIPPING SINGLE-CABINET 5000 SERIES UPS
8
CAUTION
1. Remove shrink wrap.
2. Unbolt the UPS base from the
shipping pallet.
3. Use a forklift to lift the UPS off
the shipping pallet.
4. Put down the UPS and remove
the pallet.
5000 Series NEMA-3R 3-Phase UPS Installation and Operation Manual – 92975-000
3
4

Advertisement

Table of Contents
loading

Table of Contents