Trane CVHH Installation, Operation And Maintenance Manual page 21

Water-cooled centravac chillers with tracer adaptiview control
Hide thumbs Also See for CVHH:
Table of Contents

Advertisement

2. Suspend a clear plastic tube along the length of the
chiller as show n in the follow ing figure.
3. Fill the tube w ith water until the level aligns w ith the
punch m ark at one end of the chiller.
4. Check the water level at the opposite m ark. If the water
level does not align w ith the punch m ark, use full
Figure 9.
N ot e: Use of a laser level is an acceptable alternative
m ethod to level the unit.
Im port ant : Im m ediately report any unit dam age
incurred during handling or installation at
the job site to the Trane sales office.
CVHH-SVX001A-EN
length shim s to raise one end of the chiller until the
water level at each end of the tube aligns w ith the
punch m arks at both ends of the chiller.
5. Once the unit is level across its length, repeat
through
2
1
Installation: M echanical
Step 3
to level the unit across its w idth.
Step 1
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents