Pre-Installation
WARNING
Combustible M aterial!
Failure to follow this instruction could result in death or
serious injury or equipment damage. Shrink-w rap is a
combustible material. Avoid open flames and hot
sparks.
Type of
Tr a n e Su pplie d
Re qu ir e m e n t
Tr a ne I nst a lle d
Foundat ion
Rigging
Disassem bly/ Reassem bly
•
( as required)
direct on- sit e supervision of
t he disassem bly and
reassem bly work ( cont act
your local Trane office for
pricing)
I solat ion
Elect rical
•
disconnect s ( opt ional)
•
( opt ional)
•
Wat er piping
Relief
•
•
I nsulat ion
•
Wat er Piping Connect ion
Flanged ( opt ional)
Com ponent s
•
2068.4 kPag ( 300 psig)
wat erboxes
Ot her Mat erials
12
Tr a ne Su pplie d
Fie ld I nst a lle d
Trane will perform or have
•
isolat ors
Circuit breakers or fusible
•
•
Unit m ount ed st art er
( opt ional out door air)
•
PFCCs ( opt ional)
field supplied)
•
( opt ional)
•
( m ay be field supplied)
Rupt ure disk assem bly
Rupt ureGuard™ ( opt ional)
I nsulat ion ( opt ional)
Flanged ( opt ional)
Welded on flange for
•
adapt er for 1034.2 kPag
( 150 psig) wat erboxes
N ot e: The chiller should rem ain w ithin its protective
shrink-w rap covering during storage.
Fie ld Supplie d
Fie ld I nst a lle d
•
Meet foundat ion requirem ent s
•
Safet y chains
•
Clevis connect ors
•
Lift ing beam
I solat ion pads or spring
•
I solat ion pads or spring isolat ors
Jum per bars
•
Circuit breakers or fusible disconnect s ( opt ional)
Tem perat ure sensor
•
Elect rical connect ions t o unit m ount ed st art er
( opt ional)
Flow sw it ches ( m ay be
•
Elect rical connect ions t o rem ot e m ount ed st art er
( opt ional)
Rem ot e- m ount ed st art er
•
Wiring sizes per subm it t al and NEC or local codes
•
PFCCs ( rem ot e m ount ed st art er opt ional only)
•
Term inal lugs
•
Ground connect ion( s)
•
Jum per bars
•
BAS w iring ( opt ional)
•
I PC wiring ( AFD and rem ot e- m ount ed st art ers only)
•
Cont rol volt age wiring ( AFD and rem ot e- m ount ed
st art ers only)
•
Oil pum p int erlock wiring ( AFD and rem ot e m ount ed
st art ers only)
•
High condenser pressure int erlock wiring ( AFD and
rem ot e m ount ed st art ers only)
•
Chilled wat er pum p cont act or and wiring including
int erlock
•
Condenser wat er pum p cont act or and wiring includin g
int erlock
•
Opt ion relays and wiring
Flow sensing devices
•
Taps for flow sensing devices
•
Taps for t herm om et ers and gauges
•
Therm om et ers
•
St rainers ( as required)
•
Wat er flow pressure gauges
•
I solat ion and balancing valves in wat er piping
•
Vent s and drain on wat erbox valves ( one each per p ass)
•
Pressure relief valves ( for wat erboxes as required )
•
Vent line and flexible connect or and vent line fro m
rupt ure disk t o at m osphere
•
I nsulat ion
•
Chiller feet insulat ion
Vict aulic
®
Vict aulic
t o flange
•
Vict aulic coupling for 1034.2 kPag ( 150 psig) and
2068.4 kPag ( 300 psig) wat erboxes
•
Fast eners for flanged- t ype connect ions ( opt ional)
•
Mat erial and equipm ent t o perform leak t est ing
•
Dry nit rogen ( 55.2 kPag [ 8 psig] m axim um per
m achine as needed)
CVHH-SVX001A-EN