Trane CVHH Installation, Operation And Maintenance Manual page 108

Water-cooled centravac chillers with tracer adaptiview control
Hide thumbs Also See for CVHH:
Table of Contents

Advertisement

Optional Accessories
If applicable, lubricate factory-installed gantries.
After the first m onth of operation, inspect Heresite
inspect as needed.
Inspect anodes.
Inspect and lubricate hinged waterboxes.
With water flow sensing option, bleed tubing from waterboxes to transform ers.
Revised: 10 Oct 2014
®
®
or Belzona
coated waterboxes after first m onth; thereafter,
CVHH Annual Inspection List

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents