– Run the oil pum p to verify pum p can provide 18 to 22 psid (124.1 to 151.7 kPad) net pressure.
– Run the oil pum p to verify pum p can provide 137.9 to 165.5 kPad (20 to 24 psid) net pressure.
– Verify and record control param eters.
– Verify all control interlocks are installed and properly functioning.
– Dry run starter (non-AFD).
M easure condenser pressures and flow.
Adjust condenser flow sensing device.
M easure evaporator pressures and flow.
Adjust evaporator flow sensing device.
Inspect m otor starter panel and perform starter panel checkout procedures.
Confirm proper phase check incom ing pow er.
Inspect control panel.
Apply separate source 120 Vac pow er to control to perform control panel checkout procedure.
Review and record unit configuration param eters.
Verify the operation of the oil tank vent valve.
Verify that the oil cooling line valve actuates.
Verify vane operator is w orking properly and m oves w ithout binding.
Dry run test starter (non-AFD).
Rem ove separate source pow er and reconnect w iring.
Preparation for Start-up
Relieve nitrogen holding charge.
Confirm proper oil pum p operation.
Confirm oil pum p pressure—regulating valve setting.
Evacuate and charge the system .
Apply pow er to the starter panel.
Verify current to the oil sum p heater.
Chiller Start-up
Set Purge m ode to " On. "
Bum p-start the com pressor and verify com pressor m otor rotation.
Start chiller.
Verify no unusual noises or vibrations and observe operating conditions.
If necessary, adjust oil pressure regulator betw een 137.9 to 165.5 kPad (20 to 24 psid) net.
M easure and verify refrigerant pum p pressure.
When chiller is stable, take system log three tim es at 15-m inute intervals.
Set Purge m ode to "Adaptive. "
Reset the " Starter Energy Consum ption" resettable.
Record a Chiller Service Report.
Review "AdaptiView Display Custom er Training Checklist. "
– Equipm ent Description
– Stopping/Starting Chiller Operation
– Alarm s
– Reports
– Data Graphs
– Equipm ent Settings
– Display Settings
– Security Settings
– Basic Troubleshooting
Revised: 10 Oct 2014
CVHH Start-up Task List

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents