5 To perform shutdown processing of the devices when a power failure occurs
The limitation on the commercial power stopped period when scheduled
operation using the UPS monitoring software
● When performing scheduled operation in which the UPS is stopped and a device
such as a breaker is used to stop the UPS at the same time that commercial
power stops, specify a period of no more than 3 months (*) for the start of the next
operation.
・ If you specify a period longer than 3 months (*), the internal timer is reset and the
scheduled operation does not start. Note that this period reduces to
approximately half when the battery is dead.
・ If a period of 3 months (*) is exceeded, you start operation by supplying
commercial power and pressing the Start Switch. However, if the battery is dead,
you may not be able to start operation.
In this case, replace the battery according to "4-2 Replacing the battery".
*
Note the time span will be shortened about half on the time to replace the battery.
When manually starting during the scheduled operation using the UPS
monitoring software
● To manually start up this unit after it has been stopped by a scheduled operation,
turn OFF the "Power" switch and turn it back ON again.
To stop the unit when it is in operation, turn OFF the "Power" switch.
Auto restart after OS closing processing using the UPS monitoring software.
When the power is restored while auto shutdown processing is being
performed
● If a power failure occurs and then the power is restored while auto shutdown is
still in progress, UPS output will stop temporarily after the set time elapses. After
shutdown is finished, do not turn on the computer until the UPS has finished
restarting.