Mounting the boiler and making connections
Fitting the boiler to the pre-plumbing jig
Fig. 5
Note
The diagram shows installation on a surface mounted
pre-plumbing jig.
The boiler can be installed on the following accesso-
ries:
Pre-plumbing jig for flush mounting
■
■
Pre-plumbing jig for sub-mounting kit
■
Mounting frame
■
Self-supporting mounting frame
Note
The fitting assembly bears the full weight of the boiler.
(cont.)
3.
2.
8. 5.
1. Remove the protective caps from the hydraulic
connections and gas connection.
2. Take the flat gasket for the gas connection from the
installation kit. Place the flat gasket on the gas
shut-off valve or gas connector (pre-plumbing jig
for sub-mounting kit).
Installation sequence
1.
4.
4x