2.
Rosemount 5408 and 5408:SIS Level Transmitters
Note
Be careful not to scratch or otherwise damage the PTFE sealing.
PTFE sealing
Tighten the bolts and nuts (see
Note
•
Re-tighten after 24 hours and again after the first temperature cycle.
•
Check at regular intervals and re-tighten if necessary.
Table
3-9).
Mechanical Installation
41