Performance And Testing Commands; Available Performance And Testing Commands; Performance And Testing Command Descriptions; Pa - Pre-Deployment Tests - Teledyne WORKHORSE Operation Manual

Horizontal h-adcp
Hide thumbs Also See for WORKHORSE:
Table of Contents

Advertisement

May 2015

Performance and Testing Commands

The H-ADCP uses the following commands for calibration and testing.

Available Performance and Testing Commands

This section lists the available Performance and Testing commands.
>p?
PA ----------------------- Pre-Deployment Tests
PC ### ------------------- Built In Tests, PC 0 = Help
PD = 00 ------------------ Data Stream Select (0-6,8,14)
PM ----------------------- Distance Measure Facility
PS # --------------------- Show Sys Parms (0=Xdcr,1=FLdr,2=VLdr,3=Mat,4=Seq)
PT ### ------------------- Built In Tests, PT 0 = Help
>

Performance and Testing Command Descriptions

PA – Pre-deployment Tests
Purpose
Sends/displays results of a series of H-ADCP system diagnostic tests.
Format
PA
Recommended Setting. Use as needed.
Description
These diagnostic tests check the major H-ADCP modules and signal paths. We recom-
mend you run this command before a deployment. These tests check the following
boards/paths.
CPU - CPU RAM and real-time clock.
Recorder - verifies recorder operation.
DSP - RAM, registers, and DSP-to-CPU Communications.
System Tests - A test signal is routed through the DSP and back to the CPU. This
checks the main electronics processor path.
Receive Path - quiescent RSSI levels are checked for [20 < RSSI < 60 counts] and the
RSSI filters are checked for proper time constants.
Transmit Path - checks transmit voltage, current, and impedance.
Sensors - verifies sensor operation.
Example
see below
>PA
PRE-DEPLOYMENT TESTS
CPU TESTS:
RTC......................................PASS
RAM......................................PASS
ROM......................................PASS
RECORDER TESTS:
PC Card #0...............................DETECTED
Card Detect............................PASS
Communication..........................PASS
DOS Structure..........................PASS
Sector Test (short)....................PASS
PC Card #1...............................DETECTED
Card Detect............................PASS
Communication..........................PASS
DOS Structure..........................PASS
Sector Test (short)....................PASS
DSP TESTS:
Page 154
EAR-Controlled Technology Subject to Restrictions Contained on the Cover Page.
WorkHorse H-ADCP Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents