Upgrade Start Failure; Flash Erase Failure; Flash V Erase Failure; Ug Data Timeout Failure - Lucent Technologies 2300EU System Administrator Manual

Isdn definity extender
Table of Contents

Advertisement

Troubleshooting
The upgrade start-up process failed. Retry upgrade.
Upgrade
Start
Failure
The destination Flash Memory did not successfully erase.
Flash Erase
Retry upgrade.
Failure
module may have a Flash memory hardware problem.
(Power-down upgrade unit and retry.)
The Flash memory did not successfully erase test. Retry
Flash V
upgrade. If it continues to fail, the destination module has a
Erase
Flash memory hardware problem.
Failure
The Remote Module was expecting a response but did not
UG Data
receive it within the required time. The upgrade failed.
Timeout
Failure
The upgrade failed.
Data End
Timeout
Failure
The code in your upgrade destination module is invalid.
UG CRC
Retry upgrade.
Timeout
Failure
54
If it continues to fail, the destination
ISDN DEFINITY® Extender 2300EU/2100EU

Advertisement

Table of Contents
loading

This manual is also suitable for:

2100eu

Table of Contents