Genie Z45/25J Operator's Manual page 16

Self-propelled servicing platform
Hide thumbs Also See for Z45/25J:
Table of Contents

Advertisement

Operator's Manual
PRE-OPERATION INSPECTION
Pre-operation Inspection
Be sure that the operator's, safety and
responsibilities manuals are complete, legible
and in the storage container located on the
platform.
Be sure that all decals are legible and in place.
See Decals section.
Check for engine oil leaks and proper fluid level.
Add oil if needed. See Maintenance section.
Check for engine coolant leaks and proper fluid
level. Add coolant if needed. See Maintenance
section.
Check for hydraulic oil leaks and proper oil
level. Add oil if needed. See Maintenance
section.
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
Electrical components, wiring and electrical
cables
Hydraulic power unit, hoses,
fittings, cylinders and manifolds
Engine, belts and related components
Fuel and hydraulic tanks
Drive and turntable motors and torque hubs
Boom wear pads
Tires and wheels
Engine and related components
Limit switches, alarms and horn
Nuts, bolts and other fasteners
14
Check entire machine for:
Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
After you complete your inspection, be sure that
all compartment covers are in place and
secured.
Self-Propelled Servicing Platform
Second Edition • Fifth Printing
Platform entry mid-rail
Beacon and alarms
Auxiliary platform components
Aircraft protection package components
Cracks in welds or structural components
Dents or damage to machine
Part No. 114047

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents