Preparing The System For Operation - Agilent Technologies 1260 Infinity User Manual

Infinity evaporative light scattering detector
Hide thumbs Also See for 1260 Infinity:
Table of Contents

Advertisement

4
Using the System

Preparing the System for Operation

Preparing the System for Operation
To prepare the system for operation:
1 Power up the detector by pressing the switch on the rear panel.
2 Open the gas distribution valve and set the pressure to 3.5 bar (51 psi). The
3 Ensure that the overflow siphon for the nebulization chamber contains
4 Select the desired temperature using your control software or the
5 Start the mobile phase flow through the system and allow the overall
50
pressure is indicated on the Status screen.
sufficient liquid. If necessary, pump a few ml of solvent through the system
to fill the nebulization chamber.
instrument control (see
Temp/Gain screen, which is accessed by pressing the
when the Status screen is presented.
system to operate for at least 15 minutes to ensure that all components are
equilibrated and a stable baseline is obtained.
Please refer to
Chapter 5
columns.
Appendix
9). The temperature is set on the
for choosing temperature settings, solvents and
Agilent 1260 Infinity ELSD User Manual
button two times

Advertisement

Table of Contents
loading

Table of Contents