Pipe Cradle Operation - Genie Z-60/34 Operator's Manual

Articulated boom lift
Hide thumbs Also See for Z-60/34:
Table of Contents

Advertisement

Seventh Edition · First Printing

Pipe Cradle Operation

1 Be sure the pipe cradle assembly and
installation instructions have been followed
properly and that the pipe cradles are secured to
the platform railings.
2 Place the load so that it rests in both pipe
cradles. The length of the load should be
parallel with the length of the platform.
3 Center the load in the pipe cradles.
4 Secure the load to each pipe cradle. Pass the
nylon strap over the load. Depress the buckle
and slide the strap through. Tighten the strap.
5 Gently push and pull on the load to make sure
the pipe cradles and load are secure.
6 Keep the load secured when the machine is
moving.
Tip-over hazard. The weight of the pipe cradle
assembly and the load in the pipe cradles will
reduce the rated platform capacity of the
machine and must be factored into the total
platform load.
Tip-over hazard. The weight of the pipe cradle
assembly and the load in the pipe cradles may
limit the maximum number of occupants in the
platform.
Maximum Pipe Cradle Capacity
All models
Pipe Cradle Assembly Weight
Part No. 133083
90.7 kg
9.5 kg
Z-60/34
Operator's Manual
Operating Instructions
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents