Communication Wiring: Termination at the First Wall-Mount Unit
Unit 1 Terminal Block
1
2
3
4
5
6
7
8
+
1.
From the controller, extend the shielded cable through a separate conduit
and route to the provided terminal block next to the wall-mount control
board.
These connections are polarity-sensitive. Two-wire communication from
control board is prewired to terminal block. Make sure to match "+" and "-"
symbols on controller terminal block.
2.
Connect the wires matching the terminal
designations (+/-) of the controller
terminals. Leave the drain wire loose.
3.
Connect another cable in a similar
fashion ("daisy chain") to route in
conduit to the second wall-mount unit.
Connect both drain wires with wire nut.
Manual 2100-674A
Page
28 of 41
9 10
11
12
13
14
15
16 17
From LV1000
Controller
FIGURE 25
Unit 1 Terminal Block
1
2
3
4
5
6
7
8
9 10
+
Unit 1 Terminal Block
1
2
3
4
5
6
7
8
9 10
+
Wall-Mount Unit 1
11
12
13
14
15
16 17
From LV1000
Controller
11
12
13
14
15
16 17
From LV1000
Controller
To Wall-Mount Unit 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lv1000Hr36apaHr58apaHr36apbHr58apb

Table of Contents