Table Of Contents - Bard Fusion-Tec Installation Instructions Manual

Hide thumbs Also See for Fusion-Tec:
Table of Contents

Advertisement

CONTENTS
List of Necessary Materials/Tools ....................6
Site Preparation ...................................................7
Model Identification .......................................... 7
Minimum Clearance .......................................... 8
Clearance to Combustibles ................................ 8
Wall-Mount Unit Mounting ..............................10
Mounting the Units ......................................... 10
Supply Air Grill Installation .................................... 10
Wall-Mount Unit Wiring ...................................16
Main Power Wiring .......................................... 16
Unit Voltage Wiring ......................................... 17
Preliminary Start Up .........................................19
LV1000 Controller Installation ........................20
LV1000 Controller .......................................... 21
Mounting the LV Controller ........................ 21
Temperature/Humidity Sensor(s) ................ 22
Dimensions ............................................9
Hoses .................................................... 11
Access to Control Panel ......................... 11
Fold-Out Diverter ..................................12
View of Installed Grille ..........................12
Mounting Instructions ...........................13
Electric Heat Clearance .........................14
Wall Mounting Instructions ....................14
Wall Mounting Instructions ....................15
Wire Routing ........................................17
WIRING: VAC Supply Wiring
Figure 14
Landing Points .....................................17
Figure 15
Adjusting the 230/208 VAC
Transformer ..........................................18
Cool and Heat Setpoints ........................19
Figure 19
Remote Indoor Temperature/Humidity
Sensor Installation ................................22
at the Controller ...................................27
at the First Wall-Mount Unit ..................28
Manual 2100-674A
Page
2 of 41
Additional LV1000 Connections ................. 24
Communication Wiring .............................. 25
LV1000 Supply Wiring .............................. 30
System Set Up ....................................................33
3. Clear Unit Alarm Logs ........................... 35
Setting Up LV1000 for Operation ..................... 35
Date/Time ............................................ 36
5. Configure Sensors................................. 37
6. Enter Total Number of Units .................. 38
7. Verify Units are Online .......................... 39
8. Clear Controller Alarm Logs ................... 39
9. Complete Installation ............................ 39
Additional Information ....................................40
Figure 28
Controller Grounding Posts ....................30
Figure 30
Figure 32
Changing Unit Setup Values ..................34
Figure 33
Figure 34
Executing Run Test ...............................35
Figure 35
Clearing Unit Alarm Logs .......................35
Figure 36
Figure 37
Changing Timezone ...............................36
Figure 38
Figure 39
Figure 40
Figure 41
Figure 42
Figure 43
Figure 44
Figure 45
Figure 46
Verifying Units .....................................39
Figure 47
Clearing LV1000 Alarm Logs .................39
Figure 48
Figure 49
Table 1
Table 2
Combustible Materials ............................8
Table 3
Electrical Specification .........................16
Table 5
Unit Status Messages ...........................41
Table 7
LV1000 Status Messages ......................41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lv1000Hr36apaHr58apaHr36apbHr58apb

Table of Contents