Jøtul GF 305 DV IPI Installation And Operation Instructions Manual page 16

Direct vent gas stove
Hide thumbs Also See for GF 305 DV IPI:
Table of Contents

Advertisement

139843_A GF 305 DV IPI 8/17
Figure 7.3.
Change the burner
injector.
6. Change the Burner Injector. See fig. 7.3. Using a 1/2"
open end wrench or deep-well socket remove the
burner injector from the brass elbow and replace it with
the injector supplied in the conversion kit.
7. Reverse the Air Shutter orientation to indicate the
appropriate fuel.
Fig.
8. Baffle Conversion - PROPANE ONLY:
• Remove two, 6 mm nuts to detach the Lower Baffle
assembly from the firebox. See fig. 7.5.
• Remove three 6 mm nuts to remove the Exhaust
Diverter from the exhust outlet. Replace the nuts on
the studs. See fig. 7.5.
• Re-install the Lower Baffle into the firebox.
9. Replace the Burner. Tilt the burner assembly downward
to engage the venturi tube with air shutter assembly.
The front burner supports must engage with the studs
at the front of the firebox. BE CERTAIN THE BURNER
IS LEVEL AND SECURELY ENGAGED WITH THE FIRBOX
FLOOR. When properly positioned, the pilot carry-over
porting will be 1 1/8" (28mm) from the pilot head. Fig.
7.6.
10. Replace the Valve Regulator. Fig. 7.7. Using a Torx T-20
screwdriver, remove the screws from the front of the
original regulator. Remove the regulator components
and replace them with the one from the conversion kit.
11. Apply the identification labels to the stove where they
16
Primary Air
Injector
7.4.
Figure 7.4.
Reverse the
Air Shutter
Shutter
head to
change
orientation
for the
appropriate
fuel.
Figure 7.5. PROPANE ONLY:
Remove Lower Baffle to access and remove the Exhaust
Diverter. Re-install the Lower Baffle.
Figure 7.6. Burner and pilot location.
Exhaust
Diverter
Lower
Baffle
1 1/8"
1.125”

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents