Graco LineLazer IV 250SPS Installation And Operation Manual page 20

16r955 1-gun ll200hs, 16r962 1-gun ll250, 16r960 2-gun ll200hs, 16r961 2-gun ll250
Hide thumbs Also See for LineLazer IV 250SPS:
Table of Contents

Advertisement

LL250 Pressurized Bead System Kit 16R962
Bead Tank Mounting
1. When only one bead tank is being installed, it
should be placed on the side of the frame furthest
from the compressor to best distribute weight.
2. Place bead tank on supporting base with outlet
fittings facing compressor.
3. Place clamping band around tank and secure with
mounting hardware shown below. Tighten until
there is no movement between clamp and bead
tank. NOTE: The flats on the clamp are not intended
to touch when hopper bracket is tightened.
20
ti24485a
NOTE: Position handle to best suit filling needs.
Loosen bolt (AA) to help swivel, then retighten.
ti24483a
AA
ti20704a
332230G

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Linelazer iv 200hs16r95516r96216r96016r961

Table of Contents